OK they would not let me shoot him. I was sad. He spent the rest of the day ordering people around from his lounge chair in the shade. He had ice on it. Annette came out and helped Lauren put up the porch posts. He stayed off it all evening and we are waiting to see how he is this AM.
Meanwhile, back at the build.
The inspector was out and we passed the nailing/roofing inspection. That is goodness. We can continue to move forward. Workwise most of the work right now is inside. Ceilings were put up in the kitchen and bathroom. Then flooring went on top so the heater and storage spaces were ready. Light cans, switches, and plugs have all been placed and wired. We have power in the panel and a couple of live plugs.
Here is a shot looking into the kitchen
Here we are looking from the middle of the great room into the bath and studio. A 180 from the last picture.
And here we are looking from the back of the studio toward the great room.
No comments:
Post a Comment