Thursday, April 11, 2013

Backfill completed

The backfill was completed today.  Drainage in place along the top.  All tamped down and inspected multiple times. All passed.  

Here is a picture.  Note the drain pipes sticking up.  

I know OMA worries that we are working too hard so we forced ourselves to hit the giants game this afternoon.  After all the weather was a PERFECT 80 degrees.  

Now all Casey has to do if figure out how to get the backhoe off the side of the mountain before it falls over.

 Actually this is a picture of a job going on across the valley from our site.  They are literally building a driveway (and we assume a house) on the side of the mountain.  So far they have 200' of driveway at an estimated cost of $500k.  Now they are continuing on up the mountain with more driveway.  Driveway alone will be $1M.  