The backfill was completed today. Drainage in place along the top. All tamped down and inspected multiple times. All passed.
Here is a picture. Note the drain pipes sticking up.
I know OMA worries that we are working too hard so we forced ourselves to hit the giants game this afternoon. After all the weather was a PERFECT 80 degrees.
Now all Casey has to do if figure out how to get the backhoe off the side of the mountain before it falls over.
Actually this is a picture of a job going on across the valley from our site. They are literally building a driveway (and we assume a house) on the side of the mountain. So far they have 200' of driveway at an estimated cost of $500k. Now they are continuing on up the mountain with more driveway. Driveway alone will be $1M.