Here is a shot in front of the retaining wall. A facing will go on this and the concrete will be poured in the middle. The boards on the floor are the panels which will make the other side of the wall.
Here is a shot behind the wall. You can walk back there. Once the wall is poured we will fill back there with the dirt in the pile, tamping it down every 2 feet.
Of course right in the middle of our construction we had to have our annual Easter Egg coloring and hunt. The guys from Sione concrete cleaned up all the dirt across the patio and side of the house. With that and a little broom action we were ready to go.
It is an understatement to say that the dirt pile in the back yard is a kid magnet. We were also very lucky as the rain held off and we had a wonderful day.
Construction fencing, no problem. A little teamwork and off we go.
And of course there were eggs in the backhoe.
No comments:
Post a Comment